Modular CEB Construction: Prototype Structure Results for 2010
Here’s an update on our progress in modular CEB construction. In a previous post we’ve seen the beginning of CEB columns and foundations. These are part of an experimental modular CEB construction method. Final Construction 2010 from Marcin...
Solar Village 2010 Update
Construction should start at Factor e Farm on about September 1. Out of nowhere, one of our readers from Germany produced this 3D walk-through of the CEB house that Will and I drew up in Qcad in 2D: The 3D walkthrough is this: Solar Village 2010 in 3D...
The Liberator Beta 2.0: Machine Overview
Things are looking up on the fully automatic, open source, CEB press – The Liberator Beta v2.0. We finally have the machine ready to run in field tests. The basic operational description is here, from the front: and from the back: Some noteworthy...
13 Bricks Per Minute… and Counting
Today’s goal was to determine maximum pressing rates attainable with The Liberator, the open source CEB press. We obtained data to verify some of the predicted rates shown in italics in this table. To boost morale, we started by pressing thin, 2...
Masonry
William took a course on brick laying last week back in the UK, in preparation for the CEB construction adventures of Solar Village 2010 this year at Factor e Farm. Here is some documentation from his course:
Solar Village 2010
William and I have been hashing out the details of construction for the coming year. Our plan is at this wiki page and further details on techniques to be used are here. We are currently planning on a CEB-straw bale hybrid – a double CEB brick wall...
Dedicated Project Visits Continued
William Cleaver will be joining us at Factor e Farm on May 1 for a Dedicated Project Visit. He’s coming from across the big pond – from the United Kingdom – and we are planning for a 3 month stay. William is not a novice to creative...